Project, Subject, Description, Summary, Detected By (Name of the Tester), Assigned To (Name of the Developer who is supposed to the Bug), Test Lead (Name), Detected in Version, Closed in Version, Date Detected, Expected Date of Closure, Actual Date of Closure, Priority (Medium, Low, High, Urgent), Severity (Ranges from 1 to 5), Status, Bug ID, Attachment, Test Case Failed (Test case that is failed for the Bug)