TECHNOLOGIES
FORUMS
JOBS
BOOKS
EVENTS
INTERVIEWS
Live
MORE
LEARN
Training
CAREER
MEMBERS
VIDEOS
NEWS
BLOGS
Sign Up
Login
No unread comment.
View All Comments
No unread message.
View All Messages
No unread notification.
View All Notifications
Answers
Post
An Article
A Blog
A News
A Video
An EBook
An Interview Question
Ask Question
Forums
Monthly Leaders
Forum guidelines
aakanksha das
NA
1
0
Programming help
Dec 5 2006 9:50 PM
I have an assignment to do where we have to design a program that does the following: Create a VB.NET application that will simulate the production progress of a manufacturing line. You will use an appropriate time interval (tick) as the standard measurement. The production line requires 5 ticks to produce a product. In addition, after 7 ticks of running time, there is a shutdown period for 2-4 ticks. Once a product begins production, it must be allowed to complete. If a shutdown period falls mid-production, it must be delayed until the product has finished. For instance, the table below shows some sample data. Time count in this chart represents the end of the time period (tick 1 means that time period 1 has finished, tick 5 means that time period 5 has finished and the first product has completed) Time Producing/Shutdown Interval Shutdown 1 product 1 producing (1) sceduled shutdown at 7 for 2 ticks 2 product 1 producing (2) 3 product 1 producing (3) 4 product 1 producing (4) 5 product 1 producing (5) - product 1 complete, draw a product completion graphic item and show product 2 at step 0 6 product 2 producing (1) 7 product 2 producing (2) Shutdown delayed: rescheduled at 10 for 2 ticks 8 product 2 producing (3) 9 product 2 producing (4) 10 product 2 producing (5) - product 2 complete, draw a product completion graphic item and show product 3 at step 0 Next shutdown at 17 for 3 ticks Calculate the shutdown time at 7 ticks after the resume time When a product has finished completion, draw a graphic icon on the form (square, ellipse, etc). The user can stop production. When the user stops production output a summary to the form listing the number of products completed. A sample screen capture is shown below. Use a design of your own choosing. The form below shows a message with adjusted shutdown and resume times when the original shutdown time would have been during mid-production. The delayed shutdown time occurs after the product has been produced and a new product has not started production.
Reply
Answers (
0
)
could i get a little bit of help please
Creating controls dynamically