I have an application which is linked to a database. The Database is very simple, only 3 fields, which are Date, Task, duration.
I am using Crystal Reports to create summary reports of the data.
The report looks something like below (Example):
Date Task Duration
18/03/06 Meeting 01:00:59
19/03/06 Lecture 01:01:56
19/03/06 Lab 02:02:01
At the bottom of the report, under the Duration field I want to have the Total Duration. I can't seem to do this. Can anybody help please?
Thanks