RAMESH GM

RAMESH GM

  • NA
  • 1
  • 2.3k

Manual Testing

Dec 20 2012 11:51 AM
1.What is the name of the testing activity that is done on a product before implementing that
product into the Client side.
A.Beta Testing B.Alpha Testing.
C.UI Testing. D.GreyBox Testing

2. To maintain a consistency between the different factors regardinga project,__________ is
necessary.
A.Quality Control. B.Pareto Analysis.
C.Software Process. D.quality Assurance.
 
3.A document that properly specifies all requirements of the customer is_________.
A. SRAS. B. CDD.
C. SRS. D. SRS-FS.

4.The ____________ is used to simulate the "Lower Interfacing Modules" in theTop-Down
Approach.
A.Driver Modules. B.Interim Stubs.
C.A Replacement Module. D.All the above.

5.The UAT Testing is done to achieve the__________-.
A.HLD. B.LLD.
C.Business Scenario. D.SRS.

6. _____________ is a systematic approach to the complete software structure specified in the
design from unit-tested modules.
A.Incremental Testing. B.System Testing.
C.Integration Testing. D.Usability Testing.

7.Who acts as a Author in TLC.
A.Test Manager. B.Test Leader.
C.Test Engineer. D.Project Manager. 

Answers (2)